Pipe Fittings & Valves / Product reference

JIS Y-Strainer

● Design and Operation: The Y-Strainers consists of a housing with opposite arranged inand outlet flanges at the same level.

Product image / Supplied material

Catalog reference

BS-PV-047

Material overview

● Design and Operation: The Y-Strainers consists of a housing with opposite arranged inand outlet flanges at the same level. Between these connections is a basket strainer made of a perforated plate, optionally covered with a cloth consisting of various materials and mesh widths. The medium to be filtered will enter the filter from the inside to the outside. Hence, the contaminations will remain within the strainer insert. The Y-Strainer could be depressurizing through the venting or draining devices. After removing of the flap the complete basket strainer could be easily removed out of the filter housing. Now the strainer can be cleaned by blowing out or blasting using compressed air, steam, or water. If necessary, the strainer should be soaked and cleaned using a suitable agent. Possibly, an optimal cleaning will be obtained using ultrasonics. The housing could be manufactured by forged steel, cast iron or a weldment (pipes and flanges). Y-Strainer can be installed both in the horizontal and vertical positions without any effect on performance providing the screen is installed in the downward position to assist draining and cleaning operations.

Additional technical information

  • Customers have special requirements for products and must provide the following instructions in the order contract:
  • Structure length
  • Connection form
  • Nominal diameter, full diameter, reduced diameter, pipe size
  • Operating medium, temperature and pressure range
  • Experiments, inspection standards and other requirements
  • If the customer provides the determined valve type and model, the customer should correctly explain the meaning and requirements of the model, and sign the contract under the conditions that the supply and demand sides understand and agree.

Order planning / Confirmed per inquiry

Quality and delivery arrangements

The following scope is aligned before an order. Inspection, documentation, packaging, transport and lead time are governed by the confirmed quotation, technical agreement and order documents.

01

Quality & documents

Material designation, standard, dimensions, tolerances, surface condition and required documents are reviewed during quotation. State any material certificate, third-party inspection or special testing requirement in the inquiry; the final scope is confirmed in writing.

02

Packaging

Packaging is selected for the product form, dimensions, weight, surface protection and handling conditions. Specify moisture protection, rust prevention, edge protection, pallets, cases, strapping or marking requirements for confirmation with the quotation.

03

Transport

The transport plan is assessed against destination, cargo volume, dimensions, loading limits and trade terms. Container, consolidated or break-bulk options are confirmed after the destination port and carrier conditions are reviewed.

04

Delivery

Lead time is calculated after specification, quantity, processing, inspection, documentation, packaging and logistics are defined. Website content is not a fixed lead-time or inventory commitment; rely on the final order confirmation.

Related products

Pipe Fittings & Valves

BS-PV-001

180° Elbow

Pipe Fittings · Other · 180

Pipe Fittings & Valves

BS-PV-002

Cap

Pipe Fittings · Other

Pipe Fittings & Valves

BS-PV-003

Elbow

Pipe Fittings · Other

RFQ / 01

Ready to discuss this specification?

Include dimensions, quantity, destination, and the standard your project requires.